BPSC PYQ 1 (2021) — Geography
The total geographical area of Bihar State is
- 94163 sq. km
- 94526 sq. km
- 94200 sq. km
- 94316 sq. km
Answer: B. 94526 sq. km
Get the weekly digest
Top current affairs + exam tips, every Monday morning.
📝 AI-generated analysis for exam preparation. This is original educational content curated for competitive exam aspirants.
The India Semiconductor Mission (ISM) has emerged as one of the most closely watched industrial-policy bets of the decade. As of December 2025, the government had approved ten semiconductor projects worth about Rs 1.60 lakh crore of cumulative investment across six states, spanning chip-fabrication plants (fabs), compound-semiconductor units and ATMP/OSAT packaging facilities.
The momentum accelerated with two milestones:
Taken together, these signal India's intent to build a large domestic semiconductor value chain and reduce dependence on a handful of foreign suppliers for the chips that power phones, cars, defence systems and data centres.
What are semiconductors and fabs?
The Semicon India Programme (the foundation):
This structure makes the programme India's semiconductor analogue to the Production Linked Incentive (PLI) model.
Approved projects (illustrative):
ISM 2.0 - the four focus areas (Budget 2026-27):
Targets:
Political & Constitutional
Economic & Financial
Social Dimensions
Governance & Administrative
International Perspective
Test yourself · no signup needed
Try 3 real BPSC PYQs, see the answer instantly, then unlock the full set free.
The total geographical area of Bihar State is
Answer: B. 94526 sq. km
When did Bihar State introduce the Green Budget for the first time?
Answer: A. Financial Year 2020-21
Which part of alimentary canal receives bile from the liver?
Answer: C. Small intestine
Free sample · Question 1 of 3
Geography · 2021The total geographical area of Bihar State is
This week's CA quiz · 20 questions
Cross-topic questions from recent current affairs
Indian Astronomers Capture Blue Straggler Star Caught in the Act of Formation
28 JulDRDO Delivers India's First Indigenous 350-kg Thrust Expendable Turbojet Engine
27 JulDRDO's Indigenous 350-kg Thrust Turbojet Engine: A Big Leap for India's Missiles
25 JulPaninian's Yantur: India's First Private Indigenous Turbofan Engine Takes Flight
23 Jul